These are the pipes and pumps for hot water for heating and washing etc.
Some more of the same pipes.
This is the main water pump, located in the bow, that's the pointy end.
The feeds ready for the bathroom
The first bulkhead in place. This is between the bathroom and bedroom.
The water tank fitted in place and the first bed frame.
The hot tank plumbed in.
Tank overflow just in case.
The bed frame finished, just waiting the ply cover
The sink base
This one is in the dining area
The kitchen taking shape
More progress pictures
The sink and temporary work top
The dining room cupboard with draws
Yep, I have started the wiring!
The power cupboard, dark outside as well
The training as a wireman all those years ago pays off!
And the door closed
The famous Thetford c403 loo
Looking into the kitchen from the dining area
Looking into the kitchen from the stern door
The store room or what will be the front cabin
The main power source
The first light
Another ceiling picture
The first window blind
Kitchen ceiling with the first coat
The catch to keep the blind back
I've had to lift the floor to put in the shower outlet
The shower walls ready to be tiled and then have a door fitted
The frame ready to have the MDF fitted to make the wall
First fit of wall frame
The new bathroom wall
The stand and cupboard waiting the sink
Bathroom ceiling and lighting pelmet
The bathroom door frame and corridor ceiling
The waste pump just fits under the floor
I have lights in the bathroom
and the base of the shower
The mount for the shower control
My very first tiles, all 5 of them!
Lining ready for tiles
Shower plumbed in.
Two walls done
Tiles round the shower taps
The shower tray in place
Well almost complete shower