So the boat has it's sides welded in place. The window holes will be cut during the week and the frame for the rear deck will be in place for next weekend. I ordered 150m of 50x50mm planed timber to prepare for the line out and I have decided where I can fit all the batteries, well there are 7!! It gives me a 1000Ah, lots of power! We should still be on course for the engine fit on the 19th March, I do hope so I had to pay for it on Friday, lots of money.
Sunday I had a very muddy walk with the GOC around Great Horwood in Bucks. I have been wetter on a walk, but I really don't think I have every been muddier!
Stop working on your blog and get on with some work! Haven't you got a boat to build?
Posted by: John Collinge | 26/02/2007 at 10:44 PM