Got off to a slow start on Sunday. The landlord locked the gate saying people shouldn't be working on a Sunday! Steve arrived at 10 and sorted things out so I only lost half an hour. My next two Sundays are taken up with other things so hopefully it will have been sorted properly by then.
As can been seen by the recent pictures things on the outside are progressing and even better, things are moving inside at last. I did rather overdo things on Saturday, not with the beer, but I hadn't realised how dehydrated I had got and later on Saturday evening I felt very odd. Anyway lots of water over a hour or so and health was restored and I didn't make the same mistake on Sunday. As I said things got off too a slow start but when we got in I pressed on and the floor is getting on. I have cut the panels to allow access to the blocks as I want to ensure the bilge is dry and I still am planning my wine cellar! I also will need to locate the shower pump under the floor. I must say a big thanks to Joe who came over Sunday to assist, a big help. The plan is to get the battens for the window fixing cut tonight and then stop by the yard one evening, landlord permitting and maybe get a window or two in place. We will see.
Comments