Excellent progress this weekend. Running water inside the boat, rather than the Thames outside! As can be seen in the pictures I have a temporary worktop as the top from B&Q will be up to 7 weeks but this means the taps can be connected up and the sink fixed in place with the drain down to the pump. The pump works okay, but pulling the plug on a full sink of water did result in a leak from the pump lid, so some more sealant will need applying to the lid joint. The main water tank has been filled, and sterilised, and the small leak around the main pump outlet fixed. The immersion heater leaked slightly as well, but this appears to be fixed. So the plan is to get on with the bathroom and then all the walls are up and the rooms in place.
Comments