As you can see from the picture the front door frame is in place. The idea of having an opening that big did raise a few eyebrows, but Steve has used some large pieces of angle to maintain the strength at the front. The locker on the rear deck is finished as well. This has been made to take 2 gas bottles so if someone wanted to add gas at a later date there is a space for the bottles. I started adding battens on Saturday but that was all that I got done. The insulation has arrived so I should start putting that up on Saturday.
Comments