Well finally I have started fitting the Thinsulate insulation, only a few weeks behind plan. Surprise, surprise it is taking longer than planned, but I have started. The gedo hatch has been dispatched by Channel glaze, only 10 weeks late!! Why is it that everything to do with boat builders is late, they just have no concept of time or of sticking to the agreed time frame!
Dave came over on Monday and helped me fit a temporary front door to make the front weather tight. It is the same style as the final one, but made of ply just to try out the design and see if it works. It also means the final one doesn't suffer during the fit out.
It is good to be starting work on the inside, but I am still very frustrated at the progress on the outside. I heart to heart with Steve is needed I think.